Bimp Blog
Practical guides on accounting, manufacturing and finance, and real Bimp implementation cases.
Latest articles
Piecework Pay Calculation in Manufacturing: 38 Workstations in Bimp
A fictional footwear factory of 65 people runs piecework pay in Bimp: rates, assembly, advances, salaried staff and the debt report. Steps with help links.
FinancesManufacturing P&L Example: A Monthly Profit and Loss Statement and How to Read It
Manufacturing P&L example for one month: revenue, cost of goods sold, gross and operating profit, margin and markup, and how to read the statement.
CasesPayment Calendar for Manufacturers: A €1,700 Gap on Friday Is Visible on Monday
A fictional power supply maker sees a cash gap four days before payroll. The payment calendar in Bimp: orders, bank, payroll and the Cash balance report.
FinancesManagement Accounting for Manufacturers: Where to Start and Which Reports to Open First
Management accounting for manufacturers: what it gives the owner, where to start and which reports to open first, with a one-month example in euros.
CasesDrone Production Tracking by Stage: Where Every Unit Is and Why Three Are Stuck
Drone production tracking by stage on a fictional batch of 20 units: production tasks, statuses, semi-finished goods, piecework and part replacement in Bimp.
ProductionMaterial Usage Variance: Consumption Norms and Overuse Control, from Spreadsheet to Hard Stop
How to set material consumption norms, calculate material usage variance on a 200-unit batch and block overuse with consumption limits in Bimp.
CasesCustomer-Supplied Fabric Accounting in Garment Manufacturing: 1,200 m of Someone Else's Cloth and Zero in Your Cost
A fictional garment shop tracks brand-owned fabric with the Processing checkbox: zero-cost batches, a loss norm, a 66 m return and real cost of its own line.
ProductionMulti-Level Bill of Materials: Accounting for Semi-Finished Goods in Your Own Production
Multi-level bill of materials explained with a cabinet example: separate BOMs for subassemblies, explosion to raw materials, subassembly cost and Bimp setup.
CasesCycle Counting in Manufacturing: An Electronics Warehouse Counted in One Shift Instead of Two Days
Fictional Sensorix counted 3,000 components zone by zone in one shift, with no stop on the SMD line. Warehouses, bins, stock counts and reports in Bimp.