ERP vs MRP vs MES: How They Differ and What a 30-Person Shop Needs

ERP vs MRP vs MES explained: what each system does, how they differ and which one a manufacturer with 10-250 people needs. Feature table and Bimp's limits.

DO
Dmytro ObukhovCo-Founder & CEO
Table of contents
In short
  • ERP keeps the records of the whole company: inventory, purchasing, sales, production, money and cost. MRP calculates which materials to buy and when, based on the production plan. MES tracks how operations are carried out at the workstations on the shop floor.
  • A shop with 10-250 people usually gets by with an ERP that has a production module. MRP is needed when bills of materials have dozens of items and lead times are long. MES pays off in serial production with equipment that sends data.
  • Bimp has no automatic MRP calculation and no MES module yet; MRP is planned. It has purchase planning by min/max stock, specifications, production orders and production tasks with stages.

In the ERP vs MRP vs MES comparison, ERP keeps the records of the whole company in one database: inventory, purchasing, sales, production, money and cost. MRP calculates which materials have to be bought, and when, for the production plan. MES records operations at the workstations on the shop floor as they happen. A shop with 10-250 people almost always needs ERP first, and MRP and MES are added for a specific reason.

The owner of a 30-person furniture shop hears three acronyms at a trade show and asks whether he has to buy all three systems. Vendors often sell them as one package, even though they solve different tasks. Below, each system is explained in two sentences, compared in a table and tied to the size of the shop.

What is ERP?

ERP (Enterprise Resource Planning) brings inventory, purchasing, sales, production, finance and payroll into one database. The result is stock levels, cost, debts and profit for the same period without reconciling spreadsheets. The minimum set of modules for a small manufacturer is covered in the article ERP for small manufacturing.

For a manufacturer, the core of an ERP consists of specifications, production orders, material write-off and cost calculation. An overview of such a system for a shop is on the page ERP for manufacturing.

ERP vs MRP, what is the difference?

MRP (Material Requirements Planning) takes the production plan, the bills of materials and current stock and produces a list: what to buy, in what quantity and by what date. ERP is wider. Inside it, MRP is a calculation module next to inventory, finance and sales.

The term manufacturing resource planning, or MRP II, means the extended version: capacity, labour hours and finance are added to materials. Today the name is often used for the production functions of a modern ERP as a whole. A typical problem a spreadsheet cannot handle, one component shared by several products, is described in the article about MRP.

MRP is useful when a product consists of dozens of items, suppliers have different lead times and orders come in unevenly. With few materials, the buyer keeps their requirements in his head and in a spreadsheet, and a full calculation adds little.

What is MES?

MES (Manufacturing Execution System) works at the shop floor level. It records what happens to each order: which operation is done, on which machine, who worked on it, how long it took and whether there was scrap. Data comes from operators through terminals or automatically from equipment.

The MES vs ERP difference fits in two questions. ERP answers “what does the product cost and are the materials in stock”. MES answers “where is this product now and why is it late”. MES systems are mostly bought by plants with conveyor lines, CNC machines and a requirement to trace batches.

What does each system cover?

The table shows how tasks are split. A ”+” means a core function of the system, “partly” means the function exists in some implementations.

TaskERPMRPMES
Stock in warehouses+uses ERP datano
Purchasing and supplier payments+calculates demandno
Product specifications+usesuses
Material requirements for the planpartly+no
Planned and actual cost+noprovides data for it
Payroll, including piecework+nopartly
Finance, debts, profit+nono
Status of each operation on the shop floorpartlyno+
Data from equipment and sensorsnono+
Batch traceabilitypartlyno+

MRP and MES rarely work on their own. Without an ERP, MRP has no stock levels, and MES has no specifications or orders.

What does a 30-person shop need?

A 30-person shop needs an ERP with a production module: specifications with stages, production orders, cost price and piecework pay. Separate MRP and MES at this scale cost more than they return, because the buyer and the foreman can still see the whole shop without help from a system.

A conventional example with a fictional company. A cabinet shop with 30 people makes about 60 products a month. Each specification has 25-40 materials: boards, edge banding, fittings. At these volumes the buyer needs a list of items that have fallen below the minimum stock. A full calculation 12 weeks ahead would add work without visible benefit. The foreman needs the stages of each product with statuses: cutting, edging, assembly.

When the shop grows to 100-250 people, the question changes. Several work areas appear, along with equipment that counts output and a need to see machine load. Then MES, or part of it, becomes justified. MRP comes earlier, when the purchasing cycle is longer than the production cycle: imported materials with 6-8 weeks of delivery, expensive components, orders for a specific customer.

Guidelines by shop size:

  • 10-50 people. ERP with a production module, purchase planning by min/max stock, stages in production tasks.
  • 50-120 people. ERP, with an MRP calculation added if there are many materials and long lead times.
  • 120-250 people. ERP, MRP and the first MES on the busiest work areas where equipment provides data.

What does Bimp have from this list?

First, the limits. Bimp has no automatic MRP calculation that builds requirements weeks ahead from the production plan yet; it is planned. There is also no MES module that collects data from machines.

What exists, according to the help center: in the product card you set the demand rate, safety stock, delivery time and min/max balance. In “Purchases → Purchase planning”, the “Need to purchase” column shows the requirement for the selected date, taking reserves and expected deliveries into account. The requirement is passed to a supplier order through Excel.

Production has specifications with materials, stages and operations, production orders and production tasks. A task is issued for one product and leads it through the stages of the specification. Depending on the stage status, Bimp records the start, creates an assembly of a semi-finished or finished product and accrues piecework pay.

How do min/max levels replace MRP in a shop?

Min/max works at the level of a single item: the system compares the balance with a threshold and suggests how much to buy. MRP starts from the production plan and pulls demand from all specifications at once. For a shop with 30-60 materials, the first approach gives the same purchasing answer faster.

The calculation in Bimp, according to the help center: Need to purchase = min balance + reserves + (demand rate × planning depth) - physical balance - expected deliveries. A conventional example for a particleboard sheet in the cabinet shop.

ParameterValue
Min balance40 sheets
Reserves for orders30 sheets
Demand rate4 sheets per day
Planning depth10 days, which is 40 sheets
Physical balance55 sheets
Expected deliveries20 sheets
Need to purchase40 + 30 + 40 - 55 - 20 = 35 sheets

The buyer sees 35, creates a supplier order and does not keep forty other items in mind. The limitation of the approach is that it does not know tomorrow’s plan. If a large order goes into production next week, the system counts it only once it becomes a reserve. For long import deliveries this is a bottleneck, and this is where MRP wins.

Why is it too early for a 30-person shop to buy MES?

MES needs a source of data: either an operator enters each operation on a terminal, or the equipment sends it itself. In a 30-person shop the first means extra work for every employee, and the second requires machines with suitable interfaces. Both options make sense where hundreds of operations are done every day and a delay at one of them stops the line.

In a small shop, the foreman sees the work area with his own eyes and closes a stage with one status in the production task. That is enough to know at which stage a product is, and the system accrues piecework pay for the completed operations. If you need to trace raw material batches to each product or the hourly load of each machine, look for a specialised solution alongside the ERP.

Before any purchase, run a test: ask the vendor to show your specification with stages, a production task and the purchase requirement for your material. If this works in one demo without custom development, the system covers the tasks of a shop your size.

What Bimp does and does not do

Bimp is a Ukrainian cloud ERP for manufacturers, in which inventory, purchasing, sales, production, payroll and finance work in one database. For a shop this means specifications with stages, production tasks with statuses, planned and actual cost, piecework pay and purchase planning by min/max stock.

What it does not have: automatic MRP calculation for the production plan, an MES module that collects data from equipment, machine load scheduling. If a shop needs exactly this, Bimp will not fit today. There is no free plan or trial; there is a demo. Planning tools that do exist are described on the page production planning.

How do you decide what to buy?

Three questions usually give the answer.

  1. Do you calculate the cost of a product after it is made from system data? If not, you need ERP first.
  2. Does the shop ever stand still because someone forgot to order a material? Try min/max levels and add MRP when they stop being enough.
  3. Do you have equipment that collects output data automatically? Only then does MES pay back.

If the answer to the second and third questions is “no”, postpone MRP and MES. The money is better spent on clean records of specifications and stock: without them, any calculation will give wrong figures.

FAQ

What is the difference between ERP and MRP?

MRP calculates material requirements: from the production plan and the bills of materials it works out what to buy and when. ERP is a wider system in which MRP is often one module next to inventory, purchasing, sales, finance and costing.

What is MES and who needs it?

MES (Manufacturing Execution System) records what happens on the shop floor for each order: who performed an operation, on which machine and when. It is needed by plants with a high flow of orders, equipment with sensors and a requirement to trace batches.

What is the difference between MES and ERP?

ERP answers what a product costs and whether materials are in stock. MES answers where a specific product is right now and why it is late. MES works on the shop floor level and takes specifications and orders from the ERP.

Does Bimp have MRP and MES?

There is no automatic MRP calculation and no MES module; MRP is planned. Bimp has purchase planning by min/max stock, specifications, production orders and production tasks with stages and piecework pay.

Does a 30-person shop need MES?

Rarely. In a shop of this size, stages and statuses in production tasks cover most needs. MES makes sense once production collects data from equipment automatically.

We will show how production accounting works on your product

In a Bimp ERP demo, a specialist shows a specification with stages, a production task, purchase planning by min/max stock and the cost price using your own product.

Book a demo