Recipe vs bill of materials: a batch with percentages, yield and losses vs a per-unit BOM. A 100 kg example and how recipe management software stores it.

DO
Dmytro ObukhovCo-Founder & CEO
Table of contents
In short
  • A recipe describes a batch: the share of each ingredient, process losses and the yield of finished mass. A bill of materials (BOM) describes one unit of a product in pieces, meters and kilograms, often on several levels.
  • In the example, a 100 kg batch of hand cream costs $181.60 in raw materials. With 3% process loss the yield is 97 kg, so one kilogram costs $181.60 / 97 = $1.87. Dividing by the input gives an understated $1.82.
  • The 75 g tube is described by a per-unit BOM: 0.075 kg of cream base, a tube with cap and a carton add up to $0.49.
  • In Bimp both are specifications: the recipe is entered per batch with the "Loss (%)" column, and the tube refers to it as a semi-finished product.

Recipe vs bill of materials: a recipe describes a batch of product, with the share of each ingredient, the process losses and the yield of finished mass, while a bill of materials (BOM) describes one unit of a product and the parts that go into it. Recipe management software has to handle both, because many plants mix a batch first and then pack it into countable units.

Picture a cosmetics plant where the technologist hands over a hand cream recipe for 100 kg. If someone enters it as a per-unit BOM and ignores losses, the cost of a kilogram in the books is 3% lower than on the shop floor. Below is a fictional worked example: a batch recipe with the math, a BOM for the tube, and how both are stored in an ERP.

What is the difference between a recipe and a bill of materials?

Both documents answer “what is it made of”, for different types of production. A recipe belongs to process manufacturing: food, cosmetics, chemicals, paints and fertilizers. The product is mixed, cooked or reacted, and you cannot take a single ingredient back out of the finished mass.

A BOM belongs to discrete manufacturing: furniture, metal structures, electronics. The product is assembled from separate parts that can be counted one by one.

FeatureRecipeBill of materials
Base quantityA batch: 100 kg, 500 liters, one mixOne unit: 1 piece, 1 set
How composition is setShares in percent or kg per batchPieces, meters, kilograms per unit
LossesProcess losses: evaporation, residue in the vesselOffcuts and scrap, tracked per material
YieldLower than the input, has to be calculatedOne product, nothing to calculate
ScalingProportional, to any batch sizeMultiplied by the number of units
LevelsUsually one: raw materials → massOften several: part → sub-assembly → product
VariantsA substitute ingredient changes product propertiesA part analogue usually changes nothing

Many plants run both types at once. A cosmetics maker cooks cream by a recipe and then fills it into tubes, and the tube is a countable product with its own BOM. For a detailed per-unit example, see the bill of materials example.

What does a batch recipe for 100 kg look like?

Lira Cosmetics (a fictional company) cooks hand cream in batches. The technologist sets the recipe as a percentage of the input, and the cost accountant converts it into kilograms and dollars. Process losses are 3%: some mass stays on the vessel walls and in the pipes.

IngredientSharekg per batchPrice, $/kgAmount, $
Purified water70%700.053.50
Glycerin10%101.6016.00
Shea butter12%124.8057.60
Emulsifier5%56.5032.50
Preservative and fragrance3%324.0072.00
Total input100%100181.60
Losses 3%3
Yield of cream base97

Cost per kilogram is calculated on the yield: 181.60 / 97 = $1.87 per kg. Dividing by the input gives 181.60 / 100 = $1.82. The gap is 3.09% on every kilogram.

At 2,000 kg of cream a month, 2,000 × $0.056 = about $112 disappears from cost every month. Prices are set from the lower number. The margin in the report ends up higher than the margin in the bank account.

How do you scale a recipe to a different batch size?

A recipe is proportional, so for another batch every line is multiplied by a factor. For a 250 kg input the factor is 250 / 100 = 2.5.

Ingredientkg per 100 kgkg per 250 kg
Purified water70175
Glycerin1025
Shea butter1230
Emulsifier512.5
Preservative and fragrance37.5
Total100250

The yield is 250 × 0.97 = 242.5 kg and the cost is 181.60 × 2.5 = $454.00. One kilogram costs 454.00 / 242.5 = $1.87, the same as in the small batch.

Sometimes the task runs the other way: a customer orders exactly 100 kg of cream. The input is then calculated from the yield: 100 / 0.97 = 103.09 kg, of which water is 103.09 × 70% = 72.16 kg. Skip this step and the plant comes up 3 kg short on every hundred.

What does a bill of materials for one unit look like?

The cream base goes from the vessel to filling in 75 g tubes. A tube is a countable product, and the technologist writes a BOM for 1 piece.

ComponentQuantity per piecePrice, $Amount, $
Cream base (semi-finished, made by the recipe)0.075 kg1.87 per kg0.14
Tube with cap1 pc0.260.26
Carton1 pc0.090.09
Total materials0.49

Check: 0.075 × 1.8722 = $0.14, and 0.14 + 0.26 + 0.09 = $0.49. There are no percentages and no batch yield here: one tube, one cap, one carton.

This BOM already has two levels, since the tube contains a semi-finished product with its own recipe. In furniture and metalworking a BOM often has three or four levels (part, sub-assembly, section, product), covered in the article on the multi-level bill of materials.

How does recipe management software store a recipe in Bimp?

In Bimp a recipe and a BOM live in the same catalog, Production → Specifications. The difference is how you fill them in. Here is the order Lira Cosmetics follows.

  1. Cream base recipe. Create a specification for the product “Hand cream base”. In “Finished product quantity” enter the batch yield, 97 kg. On the “Materials and components” tab enter the ingredients in kilograms of input (70, 10, 12, 5, 3) and put 3 in the “Loss (%)” column. “Quantity net” shows 67.9, 9.7, 11.64, 4.85 and 2.91 kg, 97 kg in total. “Planned cost price” is calculated automatically.
  2. Stages. Turn on “Use stages and operations” and add the stages “Weighing” and “Emulsifying”. Materials are linked to the stage where they are loaded, and staff operations are set as accrual types.
  3. Tube BOM. Create a specification for “Hand cream 75 g” with a quantity of 1. Add 0.075 kg of cream base and choose the cream base recipe in the “Specification” column. The tube and carton go on separate lines at 1 piece each.
  4. Scaling. In a production order enter the required volume, for example 242.5 kg of cream base. Bimp pulls the materials from the specification and recalculates them for that volume.
  5. Write-off. Output is posted with an “Assembly” document: it writes off raw materials from the warehouse, posts the cream base to stock and forms its cost price.

For expensive ingredients, set consumption limits. Fragrance costs $24 per kg, and the technologist allows 2.9 to 3.1 kg per batch. The “Minimum quantity” and “Maximum quantity” columns are turned on in the specification table settings. The production order only shows the deviation, while an assembly outside the limits cannot be saved until an administrator confirms it (material consumption limits). The cream overuse case in a bakery shows the same control at work.

A second version of the recipe, for example a winter one with a different oil ratio, is entered as another specification for the same product. It gets the “Specification kind” Non-main or a different value in “Version”. The Main specification is pulled into documents by default.

If shea butter comes from two suppliers and the lots are interchangeable, fill in the “Analogues” table in the product card and choose the “Write off by” rule: Priority, Availability or Stock balance (product analogues). In a recipe an analogue fits only when the technologist has confirmed that the raw material gives the same result. Otherwise a Non-main specification is the honest option.

What does Bimp do with recipes and what does it leave out?

Bimp is a Ukrainian cloud ERP for manufacturers, and a recipe in it is a specification for a batch. The table shows the limits.

TaskIn Bimp
Batch composition, losses in percent, net yieldYes: “Quantity”, “Loss (%)”, “Quantity net”
Recalculation for the order volumeYes, in the production order
Semi-finished product with its own recipeYes, the “Specification” column in the material line
Overuse controlYes, consumption limits with a block in assembly
Recipe variantsYes, Main / Non-main kind and the “Version” field
Storing the composition in percentNo, quantities are entered in kg for the base quantity
Reformulating by active-substance content of a raw material lotNo, the technologist does this outside the system
Regulatory formula documents (safety data sheets, INCI labels)No

For cosmetics and chemical plants there are separate pages: software for cosmetics manufacturing and chemical manufacturing software.

FAQ

What is the difference between a recipe and a bill of materials?

A recipe describes a batch of product in shares and kilograms, with process losses and yield. A bill of materials describes one unit: how many parts, sub-assemblies and materials go into a piece. Food, cosmetics and chemical plants work with recipes; furniture, metalworking and electronics work with BOMs.

How do you account for losses in a recipe?

Losses reduce the yield, so the batch cost is divided by the actual output. From 100 kg of input with 3% loss you get 97 kg, and each kilogram costs 1 / 0.97 - 1 = 3.09% more than the input-based figure.

How do you scale a recipe to a different batch size?

Multiply every ingredient by the batch factor. For 250 kg of input the factor is 2.5, the yield is 242.5 kg and the cost per kilogram stays the same. For an exact output of 100 kg, load 100 / 0.97 = 103.09 kg of input.

What should recipe management software do for a small manufacturer?

Store the batch composition with losses and net yield, recalculate it for any order quantity, link semi-finished products to the packed product, control overuse of expensive ingredients and keep recipe variants. It also has to post the write-off of raw materials so that cost is based on real consumption.

Can Bimp store a recipe in percentages?

No. A Bimp specification stores quantities for a base quantity of the product. The technologist converts percentages into kilograms once, and the production order recalculates the requirement for the planned volume.

Bring your recipe to a demo

Prepare one recipe with percentages and losses. In a Bimp demo a specialist enters it as a batch specification and shows how it flows into a production order and into cost price.

Book a demo