Cream Overuse in Cakes Cost €162.50 a Batch: How a Limit on Assembly Stopped It

Example of a fictional bakery: how to stop cream overuse in cakes. Limits in the specification, order import from Excel and a block on assembly in Bimp.

DO
Dmytro ObukhovCo-Founder & CEO
Table of contents
In short
  • Cream overuse in cakes on a batch of 500 came to 175 - 150 = 25 kg, or 25 × €6.50 = €162.50. The pastry cook added cream by eye, and the owner saw only the cost price of the month.
  • In the cake specification the limits for cream are set from 142 to 158 kg per 500 cakes. The production order shows the deviation, and the assembly does not let the document be saved until the quantity returns within the limits.
  • If 17 kg over the tolerance goes into each of 20 batches a month, that is 17 × 6.50 × 20 = €2,210. With the limit the production head sorts out the cause the same morning.

The company is fictional. Every action in Bimp is a real product feature. The figures in the example are invented, and the arithmetic can be checked on a calculator.

Cream overuse in cakes on one batch of 500 came to 25 kg, that is €162.50. By the norm a cake takes 0.30 kg of cream, so a batch takes 150 kg, but 175 kg actually went in. The owner of the bakery found out at the end of the month, when he saw the extra sum in the cost price. Nobody remembered the cause any more.

In Bimp the same batch is stopped at assembly: the system does not let the document be saved while the cream exceeds the upper limit from the specification. Below is a step-by-step look at how this is set up.

Where does cream overuse in cakes come from?

“Sweet Artel” (a fictional company) is a bakery with 40 employees. It makes cakes and desserts for coffee shops and restaurants and sells part of its output through its own wholesale channel. Orders from HoReCa arrive every week as Excel tables: each venue sends its own file, with its own names and volumes.

The norm per cake is firm: 0.30 kg of cream. For a batch of 500 cakes that is 0.30 × 500 = 150 kg. But the pastry cook on shift looks at the weight in the bowl and adds “a little more” so that the cream holds its shape. Cream costs €6.50 a kg, and the picture per batch is this.

IndicatorQuantity, kgAmount, €
Norm for 500 cakes150975
Actual write-off1751,137.50
Overuse25162.50

Check: 150 × 6.50 = 975, 175 × 6.50 = 1,137.50, and the difference is €162.50. Per cake that is 162.50 / 500 = €0.325, and the margin of every dessert shrinks by that amount. The owner saw only the monthly total, and flour, eggs, cream and electricity dissolved in it. Finding who added the extra and when was impossible.

How do you set a limit on cream in the specification?

First, the order. Every week the files from venues go into one production order. The manager does not enter cakes by hand: on the “Products” tab he clicks “Import” and chooses a file with the columns “Product”, “Specification”, “Modification”, “Quantity” and “Unit”. Bimp pulls in the materials by specifications and calculates the requirement for the given quantity. The names in the file must match the names in Bimp letter for letter, so venues are given a shared template (import from Excel).

Next, the limits. In the cake specification open the “Materials and components” tab and turn on the columns “Minimum quantity” and “Maximum quantity”. For cream per 500 cakes the technologist enters limits from 142 to 158 kg. The tolerance is about 5% either way, because cream has a natural spread when whipped. The same is done for flour (consumption limits).

Now three roles in the process work under different rules.

The production order only shows the deviation. The “Material consumption control” tab shows the actual quantity, the limits recalculated for the planned output and the column “Deviation from norm”. A plus means overuse, a minus means under-use, and zero is the tolerance limits. A deviation counter sits next to the tab name, and the “Only with deviations” switch hides materials within the norm. There are no blocks here on purpose: production planning should not be held up by a temporary mismatch.

The assembly works strictly. When the pastry cook writes off 175 kg of cream, the system sees 175 - 158 = 17 kg above the upper limit. On saving, a message appears saying the quantity of materials must be within the norm (assembly). The document cannot be saved until someone corrects the figure or confirms the deviation.

The administrator can allow saving if the reason is sound, for example a batch of cream turned out thinner. He clicks “Save with deviations”, and the quantity actually entered is written off the warehouse. The event stays in the “Change history” with the date, time and author.

Challenge

On a batch of 500 cakes the pastry cook adds cream by eye: 175 kg goes in instead of 150 kg. The overuse of 25 kg costs €162.50, and the owner sees it only in the cost price of the month.

Solution with Bimp

The specification sets limits for cream from 142 to 158 kg, orders from Excel are imported into the production order, and the assembly does not save with a quantity above the upper limit without the administrator’s confirmation.

Result in numbers

Overuse 175 - 150 = 25 kg, or 25 × 6.50 = €162.50 per batch. Above the tolerance 175 - 158 = 17 kg, and these are what block saving. With 20 batches a month that is 17 × 6.50 × 20 = €2,210.

What happens in the morning when the limit fires?

The pastry cook enters the actual write-off, clicks “Save” and sees a refusal. He calls the shift supervisor. The supervisor opens the “Material consumption control” tab in the assembly and sees a red row: cream +17 kg. Then there are two roads.

The first: the quantity is corrected. Perhaps the pastry cook entered one measuring container twice or took cream for another order. After the correction the deviation disappears, the document saves, and the counter on the tab is empty.

The second: the deviation is justified. Then the administrator checks the list of mismatches in the window and confirms saving. The owner later opens the “Change history”, filters the action type “Saved with deviations” and in a minute sees all cases: who, when and in which documents.

Let us compare two sums for a month. Suppose a month holds 20 batches and in each the pastry cook leaves the same 175 kg.

What we countOver the limit, kg per batchLosses for the month, €
Overuse against the 150 kg norm2525 × 6.50 × 20 = 3,250
Above the 158 kg upper limit1717 × 6.50 × 20 = 2,210

The first sum shows the full losses against the norm. The second shows what lies outside the tolerance: 8 kg per batch (158 - 150) the technologists regard as natural spread. The system stops letting through the €2,210 without a human decision, and the remaining 8 kg (€52 a batch) the company deliberately leaves within the tolerance.

What else changes in the work of the bakery?

The production head sorts out the cause the same day. Without a limit he would see the figure three weeks later, when the cream had already run out and the orders were shipped. With the limit the problem is stopped on the first batch and never reaches the twentieth.

The technologist gets a tool to learn from. If deviations on the same item repeat, the limits are too narrow or the recipe should be reviewed. That way the norms stop being a table lying apart from production. More about norms and overuse control is in the article Material Usage Variance.

The owner sees the cost of a cake without surprises. Breakage and scrap that exceed the tolerance are written off by the pastry cooks with a separate document and an expense item, so they do not hide in the cream consumption. How to split the value of raw materials between several outputs is told in the material By-Product Cost Allocation.

The wholesale sales manager sets the price of a dessert from the real cost of the batch. If cream rose from €6.50 to €7.15 a kg (by 10%), then for 150 kg by the norm that is 150 × 7.15 = €1,072.50 instead of €975, which is €97.50 more. He sees it before he signs the price list for coffee shops.

For a production where raw materials make up most of the cost, this mechanism gives the owner a concrete action instead of an after-the-fact report. It needs no extra people on the shift: the system compares every write-off with the limit by itself and reports the deviation while the pastry cook is still standing at the mixer.

The weekly rhythm deserves a separate mention. On Monday the manager loads the venues’ files into one production order, and the “Material consumption control” tab at once shows how much cream and flour are needed within the tolerance for the whole week. Purchasing takes this requirement instead of guesses. On Friday the production head filters the tab by deviations and in five minutes sees on which batches the norm was broken. The talk with the shift starts from a concrete document and a concrete figure, so it ends with an agreement, and nobody argues about who poured how much.

Scenario limits

The limit works for materials where a minimum or maximum quantity is filled in. If the fields are empty, control does not apply to the material, so limits must be set for every item that affects the margin. If a material was added to the document by hand outside the specification, a dash stands in the limit columns. The limits are calculated for the quantity of products stated in the specification and scale together with the output plan.

The limit does not replace the recipe and does not cure the cause. It makes overuse visible on the day it happens, when it can still be explained. Control does not know the causes: it shows that the norm is broken, and a person sorts it out. Only an administrator or the account owner can confirm a deviation in the assembly, so the team should agree who does it. Check the button and column names against your version of Bimp.

An overuse of €162.50 on one batch looks small until it is multiplied by twenty batches. How to set up accounting in food production is described on the page Bimp for food production.

FAQ

Does Bimp block a production order if more cream was written off than the norm?

No. In a production order the control is informational: the "Material consumption control" tab shows the deviation, but the document saves. The hard block works in the assembly.

Who can save an assembly with overuse?

Only a user with "Administrator" rights or the account owner. They confirm the deviation with the "Save with deviations" button, and the action is recorded in the "Change history".

What is written off the warehouse if the assembly is saved with a deviation?

The quantity actually entered. The specification norm no longer applies here, so the overuse goes into the cost price of the output.

Why did a row from Excel not load into the production order?

Most often the name of the product or the specification in the file does not match the name in Bimp: an extra space or a wrong letter gets in the way. Check the names against the reference lists.

Check the limits on your own recipe

In a Bimp ERP demo a specialist sets consumption limits for one of your products with you and shows how the block on assembly works.

Book a demo
DODmytro ObukhovCo-Founder & CEO